Abdolreza

Dr Abdolreza Roshani


Senior Lecturer and UG Program Director in Business Analytics
BSc, MSc, PGc, FHEA, PhD

About

Research

Research interests

Teaching

Sustainable development goals

My research interests are related to the following:

Affordable and Clean Energy UN Sustainable Development Goal 7 logo
Decent Work and Economic Growth UN Sustainable Development Goal 8 logo
Industry, Innovation, and Infrastructure UN Sustainable Development Goal 9 logo
Sustainable Cities and Communities UN Sustainable Development Goal 11 logo
Responsible Consumption and Production UN Sustainable Development Goal 12 logo

Publications

Roshani, A., Parry, G. and Walker-Davies, P., 2026. Mathematical formulations and a Relax-and-Fix heuristic algorithm for capacitated reliable fixed-charge facility location problems. Journal of Heuristics.

Lu, C., Roshani, A., Parry, G. and Emrouznejad, A., 2025. Multi-level risk assessment in additive manufacturing systems: a multiplicative nonparametric approach. International Journal of Production Research, pp.1–20.

Roshani, A., 2025. Energy-aware production planning and scheduling in a two-parallel-machine system. Proceedings of the 5th International Conference on Electrical, Computer and Energy Systems.

Roshani, A., Walker-Davies, P. and Parry, G., 2024. Designing resilient supply chain networks: a systematic literature review of mitigation strategies. Annals of Operations Research, p.28.

Roshani, A., Parry, G. and Davies, P., 2024. Supply chain resilience: capacitated reliable fixed-charge facility location problems. IET Digital Library.

Pasha, J., Li, B., Elmi, Z., Fathollahi-Fard, A.M., Lau, Y., Roshani, A. and Kawasaki, T., 2024. Electric vehicle scheduling: state of the art, critical challenges, and future research opportunities. Journal of Industrial Information Integration, 38, p.100561.

Akhgar, S., Fattahi, P., Vahedi-Nouri, B. and Roshani, A., 2024. Mathematical modeling and solving flow shop scheduling problem in a reconfigurable material handling system. Journal of Industrial Engineering Research in Production Systems.

Abdolreza, R., Parry, G. and Davies, P., 2023. Designing resilient and energy-efficient additive manufacturing enabled supply chains. IET Conference Proceedings, CP846(14), pp.10–11.

Roshani, A., Paolucci, M., Giglio, D., Demartini, M., Tonelli, F. and Dulebenets, M.A., 2023. The capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain network. Annals of Operations Research, 321, pp.469–505.

Singh, P., Pasha, J., Khorram-Manesh, A., Goniewicz, K. and Roshani, A., 2021. A holistic analysis of train-vehicle accidents at highway-rail grade crossings in Florida. Sustainability, 13(16), p.8842.

Ghasemi, M., Roshani, A., Muhammad Ali, P.J., Nia, F.F. and Nazemi, E., 2021. Design and construction of Zana robot for modeling human player in rock-paper-scissors game using multilayer perceptron, radial basis functions and Markov algorithms. ARO – The Scientific Journal of Koya University, 9(1).

Roshani, A., Paolucci, M., Giglio, D. and Tonelli, F., 2021. A hybrid adaptive variable neighbourhood search approach for multi-sided assembly line balancing problem to minimise the cycle time. International Journal of Production Research, 59(12), pp.3696–3721.

Roshani, A. and Esfandyari, A., 2020. Assembly line balancing problem with skilled and unskilled workers: the advantages of considering multi-manned workstations. Journal of Industrial and Systems Engineering, 13, pp.66–77.

Roshani, A. and Giglio, D., 2020. A tabu search algorithm for the cost-oriented multi-manned assembly line balancing problem. International Journal of Industrial Engineering & Production Research.

Ghasemi, M., Roshani, G.H. and Roshani, A., 2020. Detecting human behavioral pattern in rock, paper, scissors game using artificial intelligence. Computational Engineering and Physical Modeling, 3(1), pp.25–35.

Giglio, D., Paolucci, M. and Roshani, A., 2017. Integrated lot sizing and energy-efficient job shop scheduling problem in manufacturing/remanufacturing systems. Journal of Cleaner Production, 148, pp.624–641.

Roshani, A., 2017. Mathematical formulations and heuristic approaches to optimize some production tasks in manufacturing and remanufacturing systems. Università degli Studi di Genova.

Roshani, A. and Ghazi Nezami, F., 2017. Mixed-model multi-manned assembly line balancing problem: a mathematical model and a simulated annealing approach. Assembly Automation, 37(1), pp.34–50.

Giglio, D., Paolucci, M., Roshani, A. and Tonelli, F., 2017. Multi-manned assembly line balancing problem with skilled workers: a new mathematical formulation. IFAC PapersOnLine, 50(1), pp.1211–1216.

Roshani, A., Giglio, D. and Paolucci, M., 2017. A relax-and-fix heuristic approach for the capacitated lot sizing problem in manufacturing/remanufacturing systems. IFAC PapersOnLine, 50(1), pp.9008–9013.

Roshani, A. and Giglio, D., 2017. Simulated annealing algorithms for the multi-manned assembly line balancing problem: minimising cycle time. International Journal of Production Research, 55(10), pp.2731–2751.

Roshani, A., Giglio, D. and Paolucci, M., 2016. A simulated annealing approach for the capacitated dynamic lot sizing problem in a closed remanufacturing system. IFAC-PapersOnLine, 49(12), pp.1496–1501.

Roshani, A. and Giglio, D., 2015. A mathematical programming formulation for cost-oriented multi-manned assembly line balancing problem. IFAC-PapersOnLine, 48(3), pp.2293–2298.

Roshani, A. and Giglio, D., 2015. A simulated annealing approach for multi-manned assembly line balancing problem type II. IFAC-PapersOnLine, 48(3), pp.2299–2304.

Salehi, M., Fattahi, P., Roshani, A. and Zahiri, J., 2013. Multi-criteria sequencing problem in mixed-model synchronous assembly lines. The International Journal of Advanced Manufacturing Technology, 67(1–4), pp.983–993.

Roshani, A., Roshani, A., Roshani, A., Salehi, M. and Esfandyari, A., 2013. A simulated annealing algorithm for multi-manned assembly line balancing problem. Journal of Manufacturing Systems, 32(1), pp.238–247.

Roshani, A., Fattahi, P., Roshani, A., Salehi, M. and Roshani, A., 2012. Cost-oriented two-sided assembly line balancing problem: a simulated annealing approach. International Journal of Computer Integrated Manufacturing, 25(8), pp.689–715.

Fattahi, P., Beitollahi Tavakoli, N., Fathollah, M., Roshani, A. and Salehi, M., 2012. Sequencing mixed-model assembly lines by considering feeding lines. The International Journal of Advanced Manufacturing Technology, 61(5), pp.677–690.

Zangeneh, S., Lashgari, H.R. and Roshani, A., 2012. Microstructure and tribological characteristics of aged Co–28Cr–5Mo–0.3C alloy. Materials & Design, 37, pp.292–303.

Fattahi, P., Manesh, M.S. and Roshani, A., 2012. A new solution seed for job shop scheduling problem. Applied Mechanics and Materials, 110, pp.3899–3905.

Roshani, A. and Roshani, A., 2012. Multi-manned assembly line balancing problem: minimizing cycle time. IIE Asian Conference Proceedings, pp.612–620.

Malekbarmi, A., Zangeneh, S. and Roshani, A., 2011. Assessment of premature failure in a first stage gas turbine nozzle. Engineering Failure Analysis, 18(5), pp.1262–1271.

Fattahi, P., Roshani, A. and Roshani, A., 2011. A mathematical model and ant colony algorithm for multi-manned assembly line balancing problem. The International Journal of Advanced Manufacturing Technology, 53(1), pp.363–378.